Project Scope
GeoSpectra executed tractor mounted piling works for an RMC Plant foundation
at Maksi. The project involved installation of pile foundations in challenging
black cotton and mixed soil conditions to provide stable load transfer and
minimize settlement risks.
Challenges & Solution
The presence of expansive black cotton soil required a foundation solution
capable of transferring structural loads below the active soil zone.
Tractor mounted piling was selected due to site accessibility, cost efficiency,
and suitability for the project requirements.